Traffic Alert for Sunday October 11th
SCE&G will arrive on site at 6 am with 16 lineman and 5 bucket trucks on Sunday, Oct 11th at the intersection of Coleman / Ben Sawyer and Chuck Dawley. At 6:30am, once two police cars block Coleman Blvd in each direction, SCE&G will block the yield turn lane from Chuck Dawley onto Coleman. Once all traffic has stopped, SGE&G will cut down the span of wire that crosses Coleman Blvd, near Ace Hardware.
Immediately after that, SCE&G will cut down the span that crosses Russell Drive. This should take no longer than 30 minutes.